Home About How we work Cases Reviews Oversized and project cargo Container shipping Reefer shipping Supplier sourcing in China Tools Glossary Blog 0 800 20 12 67 Free check-up
Client cases

What we did — and what came out of it

These are client stories, not a list of services. Some results are easy to count in dollars and days. Some are not — yet those are the ones people name as the main thing in NPS interviews. Open any case to see it in full: what they came with, where they were losing money and time, what we changed.

87%of clients have worked with us for years
83%come back after the first order
$25Mvalue of cargo in transit each month
Container · Sea freight

A production line from China to Poland — 24 containers instead of 30

The supplier quoted 30 containers and 60 days by sea. We reviewed the packing and routed the cargo via Rotterdam instead of the standard Polish ports.

$30,000 + 15–20 days

Context

The client was shipping a production line from China. The shipment had been calculated by the supplier — 30 containers, 60 days by sea through the standard Polish ports. On paper it looked fine, so nobody asked questions.

Where they were losing

The cubic capacity was counted “as the supplier declared”, not as the equipment actually stows. Plus the default route — into the busiest ports, where a container waits extra days for handling and discharge.

What we did

We recalculated the packing together with their engineer — some items were stowed more tightly, with no risk to the equipment. And we routed the cargo via Rotterdam instead of the standard Polish ports: a better vessel schedule and less queueing at the terminal.

Result

24 containers instead of 30 and 15–20 days faster — about $30,000 saved on this one shipment. It is not a one-off trick: this is how we look at every cubic calculation before confirming it.

Container · Multimodal

We found the “air” in the containers — every 5th one travelled free

For years the client believed a truck through Poland could carry 22 tonnes at most, and quietly paid for the rest as air. We consolidated the cargo in China and moved the transit to rail.

every 5th container free · growth 4–5 → 17–20/month

Context

For years the client shipped by truck through Poland and was certain that 22 tonnes per vehicle was the ceiling. The difference in weight he quietly paid for — effectively shipping air and paying for it as cargo.

Where they were losing

22 tonnes is a limit of a specific scheme (a truck), not of the physics of the cargo. Nobody had recalculated how much would fit if the delivery method changed.

What we did

We consolidated the cargo back in China and moved the transit to rail. The norm grew to 28 tonnes per container instead of 22.

Result

+6 tonnes on every container means effectively every 5th container travels free. The volume with this client grew from 4–5 to 17–20 containers a month. Let’s be honest: he was not paying us for “cheaper” — he was paying because somebody finally recalculated his scheme.

Reefer

Sisal that arrived mouldy twice — saved by a reefer

Fabric for cat scratching posts absorbs moisture faster than silica gel: in a standard container, condensation turned the cargo into scrap twice. We put the non-food fabric into a reefer.

€35,000 per container · with us for 2 years

Context

Sisal — a natural fabric for cat scratching posts — absorbs moisture faster than silica gel. In a standard dry container the temperature swings during the voyage, condensation collects on the walls — and the cargo arrived mouldy twice. Twice into the bin.

Where they were losing

The losses were written off as “force majeure of the sea”. In reality the problem was predictable: condensation in a dry container on that kind of fabric is a matter of time, not luck.

What we did

We put the non-food fabric into a reefer and held a stable temperature the whole way. No condensation — no mould. The key here is not “a reefer instead of a dry box”, but that the cause was found before the shipment, not after the third ruined container.

Result

€35,000 of cargo per container arrives intact. The client has been with us for 2 years now.

Container · Customs clearance

Feed additives kept getting stuck at veterinary control in Poland — we removed the idle time

Polish vet inspectors would not accept English certificates — they demanded notarised translations into Polish. An appointment with the vet took a week; the free days in port were 5–7. The container stands still, demurrage runs.

$700–800 per container

Context

The client shipped feed additives through Polish ports. A standard scheme — until hell started at veterinary control.

Where they were losing

Polish veterinary inspectors would not accept certificates in English — they demanded notarised translations into Polish. An appointment with the vet took a week. And the free days in port were 5–7. The container stands still, demurrage runs.

What we did

We didn’t like that — so we dug in. We found a local agent specialising precisely in veterinary control at that port. We introduced document pre-checks before the vessel even arrived. And we changed the line to one that gives 21 free days instead of 7.

Result

$700–800 saved on every container, and there are 10–12 such shipments a year. Idle time at the border is not always “unavoidable costs”. Often it is a signal that homework needs doing. Somewhere in Ukraine a dog is happily crunching treats — delivered on time and with no aftertaste of extra costs.

Container · Multimodal

The container was discharged in Antwerp instead of Hamburg — the plant started on time

The container from Shanghai was running late, and Hamburg meant four more weeks. Our manager noticed the same vessel calls at Antwerp a week earlier — and suggested discharging there.

4 weeks → 1

Context

The container from Shanghai was already off schedule — production ran late, then the cargo hung in transit. On the standard route it was going to Hamburg, and that meant four more weeks. For the receiving plant those four weeks meant a halted start-up and customers already breathing down their neck.

Where they were losing

The route was run by default — to the final port. And nobody was checking that the same vessel calls at another port much earlier along the way.

What we did

The customer manager looked at the vessel’s schedule. Antwerp — in a week. We called the client: we discharge the container there and move on by land to Ukraine.

Result

Four weeks turned into one. The plant started on time. Yes, the detour cost a couple of thousand euros — but a day of plant downtime costs more. Six months earlier we had missed a similar manoeuvre: the client spotted it, not us. That stuck with us. This time we made the call. Because flexibility is work done before the problem starts.

Oversized · Execution

An XCMG 50 t mobile crane — delivered as one unit instead of two

The jib of a mobile crane is usually removed for transport — and that makes two pieces of cargo instead of one. We agreed with the factory to secure it as a single structure within the gauge.

$6,150 saved

Context

A spa centre developer in the Vinnytsia region looked at crane rental prices in Ukraine — and decided to buy their own. They checked the Ukrainian marketplaces, then looked towards China. We connected them directly with the main XCMG dealer: the crane they needed was in stock, and the configuration was even upgraded — it came out 30% cheaper than used machinery in Ukraine. A new 50 t mobile crane: jib, counterweights, filters.

Where they were losing

The jib is a boom extension, a separate large part. It is usually removed for transport, because otherwise the structure goes beyond the gauge. But the moment you remove it, you get two pieces instead of one. The shipowner counts each one separately. And on land it means two low-loaders, two customs entries, two T1s.

What we did

We had been through this before — with SANY cranes. Back then we went through logistics and customs battles proving it made sense to move a single unit. So we asked the factory: can the jib be secured directly on the crane as a single structure without increasing the gauge? It can. That is what we did. Then three rounds of negotiation over the wording in the bill of lading — until customs agreed.

Result

$6,150 saved: $3,650 at sea and $2,500 because a second low-loader was not needed. A direct quote from the client: “Thank God you pushed that wording through in the bill of lading. You simply saved the delivery from customs problems and extra costs.”

And some results can’t be counted in dollars — yet those are the ones clients name as the main thing in NPS interviews.

Service · Communication

We removed the chaos from logistics with China

The owner of an import business — three children and a dog. She named as the main advantage not the rate, but the fact that logistics stopped being a source of stress.

chaos → system

Context

The owner of an import business. Three children and a dog, zero time. At the start — constant calls of “where is the container?”, documents remembered at the last moment, and the feeling that logistics lives its own chaotic life.

Where they were losing

Not in the rate. In the uncertainty: every stage had to be dragged out with questions, and a surprise with documents could stop a shipment.

What we did

We structured the communication, made convenient updates and wrote out document checklists at clearly defined stages — so it is visible what is needed and when, ahead of the step rather than after the failure.

Result

In the NPS interview she named as the main advantage not the price, but that logistics stopped eating her nerves. The chaos became a system.

Service · Communication

We gave a director back time for his life

The head of logistics had not managed to get out fishing with his six-year-old son for a year — he assumed that after the promotion it would never be otherwise.

fewer fires → more time for yourself

Context

The head of logistics. For a year he could not get out fishing with his six-year-old son — he was sure that after the promotion it would always be like that: more responsibility means less life.

Where they were losing

Time and nerves. Most of the “fires” were not unique disasters but routine nobody had turned into a process — so everything rested on his manual control at any hour.

What we did

We showed that most of those processes can be tamed, and wrote down who takes which decisions outside working hours. Flexibility is when the work is done before the problem starts, not firefighting at 11 p.m.

Result

Fewer fires — more time for yourself. And yes, he did get to that fishing trip.

Recognise your own situation?

Tell us what you ship and from where. In 30 minutes of a free check-up we’ll show exactly where you are losing money and time — on your scheme, not in general terms.

Free check-up
Quick contactCheck-up